Migrate from Standard Trial 4.4 to Small Business Edition 5.0.2523
How can I migrate 4.4 trial to SBE 5.0.2523 ?
Hi Robert,
If you have an active site on Sitefinity 4.4 using a trial license, you can easily download and create a 5.0 project and again use your trial license. Then you can either use the project manager to upgrade your 4.4 site or extract the contents of the bin folder of a brand new 5.0 project and paste in your projects bin folder, which should initiate the upgrade scripts ( you may need to restart your application after replacing the .dll files ).
However if you have bought a 5.0 license for Sitefinity, you can download a license for a Sitefinity 4.4 and apply it to your site. Then you can follow the above procedure.
Another option is follow the above process, but instead of applying a trial license for your Sitefinity 5.0 installation, use the license you bought.
Regards,
Victor Velev
the Telerik team
I have created a project using Sitefinity Project Manager using the Standard Trial 4.4, now we bought a license for SBE 5. I am currently testing on my local machine.
For what I understand.
1. I can download the SBE 5 version and run its Project Manager.
2. Import the project created from standard trial 4.4.
3. Use our SBE 5 license into the imported 4.4 project. Will this work?
or I will use the 4.4 license?
Hi Robert,
1). You can set a project manager for 5.0 and one for 4.4 in different folders. Please note that I am referring to Project Managers, not the .msi.
2). You should not be having any troubles using your SBE license, but any modules or content that are not included in the SBE of the software will not be present in your project after you apply the SBE license. Please check the following page regarding the different features of the editions of Sitefinity:
www.sitefinity.com/purchase.aspx
3). You can install Sitefinity on VM, as long as all requirements are fulfilled. Make sure that you have a backup copy of your project.
Greetings,
Victor Velev